Upgrade of DP2 Multipurpose Ships / “GLOMAR WORKER” & “GLOMAR SUPPORTER”

Scope of Work: UPGRADE FEASIBILITY STUDY  &  CONTRACT ENGINEERING

LIST OF MOST RELEANT TASKS:

      • New Accommodation Extension.
      • New mezzanine deck rated for strenght of 5t/sqm (no enclosed volumes, no variation of GT).
      • Additional Hipap Trunking.
      • Replacement of the existing provision crane, fixed boom type, with retractable knuckle type.
      • Full package of Stability information (including inclining test).
      • Sea-Ballast-Water-FREE (no BWT system – BW Convention exempted).
      • Sea-fastening of deck equipment
      • Full package of documentation for DP2 Class (FMEA, Sea DP Trials, DP Operations Manuals etc)